- Home
- Publications
- Online Library
- Back-fill grout with two component mix in EPB tunneling to minimize surface settlements: Rome Metro - Line C case history
Back-fill grout with two component mix in EPB tunneling to minimize surface settlements: Rome Metro - Line C case history
S. Pelizza;
D. Peila;
R. Sorge;
F. Cignitti
IS ROME '11
1.Construction, design, and measured performance of bored tunnels
Grouting,
Settlements,
Tunneling