From design to the construction – the case of the track tunnels T33 and T34 between Rato and Santos of the future circular line of Lisbon metro




From design to the construction – the case of the track tunnels T33 and T34 between Rato and Santos of the future circular line of Lisbon metro


V. Ribeiro; J. C. Andrade; J. Simoes; O. Marques; P. Araujo; N. Vaz


18th European Conference on Soil Mechanics and Geotechnical Engineering (ECSMGE2024)



D - Current and new construction methods