Geothecnical investigations that implicated on the replacement of foundations during the pre-construction stage: case study of Phelippe Daou bridge.




Geothecnical investigations that implicated on the replacement of foundations during the pre-construction stage: case study of Phelippe Daou bridge.


Samuel Caloba Aguiar; Rene Levy Aguiar


17th European Conference on Soil Mechanics and Geotechnical Engineering



A.2 - Investigation by in situ tests



Foundation Design / Construction