The use of early-works embankments in soft soil areas to optimize detailed design: Gateway Motorway case study




The use of early-works embankments in soft soil areas to optimize detailed design: Gateway Motorway case study


N. Manche; J. Alinur; M. Phillipson


7th International Young Geotechnical Engineers’ Conference (7iYGEC)



Australasia



Transportation Geotechnics, Road Embankments