- Home
- Publications
- Online Library
- The use of early-works embankments in soft soil areas to optimize detailed design: Gateway Motorway case study
The use of early-works embankments in soft soil areas to optimize detailed design: Gateway Motorway case study
N. Manche;
J. Alinur;
M. Phillipson
7th International Young Geotechnical Engineers’ Conference (7iYGEC)
Australasia
Transportation Geotechnics,
Road Embankments