Ground movements during tunnel construction by EPB method along the southern extension of Athens Metro Line 2, Greece




Ground movements during tunnel construction by EPB method along the southern extension of Athens Metro Line 2, Greece


Nikolaos Boussoulas; Fotios Karaoulanis; Elena O. Papageorgiou; Stefanos S. Tsotsos


17th International Conference on Soil Mechanics and Geotechnical Engineering (Alexandria)



Deep Excavation, Tunnelling and GroundWater Control



Foundation Design / Construction, Tunneling